Emergency ADSL pipe rebalance - 20/01/10, 18:30
Following the loss of a tunnel on one of the BT central pipes overnight, NewNet engineers will be re-balancing the pipes during an emergency maintenance slot on 20/01/10 - 18:30. All IPStream sessions will be disconnected as a result of this maintenance, but should re-connect automatically. If your session does not re-connect automatically, please try power cycling your ADSL modem/router. If you still have no connection following this, please contact NewNet’s support team.
Anyone who is experiencing issues before the re-balance at 18:30 should attempt disconnecting and re-connecting their PPP session (Power cycling their ADSL router/modem). This may need to be attempted a couple of times before the session is established on an unaffected pipe.
January 20th, 2010 at 9:35 pm
Session balance at 1830 was successful.